Skip to content
University of Sydney Image_2 LOW RES

PROJECT

University of Sydney

Central Operations Services

CLIENT

University of Sydney

SERVICE

RCD Upgrades

LOCATION

Regional NSW - Narrabri & Nowley Campuses

COMPLETED
July 2024

PROJECT INFORMATION

Platinum Electricians was selected by The University of Sydney as a trusted panel provider to carry out critical RCD upgrades across the Narrabri and Nowley campuses as part of their 2024 Maintenance Program. The project aimed to enhance electrical safety and compliance across multiple buildings by upgrading outdated circuit protection infrastructure.

20240904_095931

OBJECTIVES & PRIORITIES

objectives-_fit for purpose
Fit for Purpose
(compliant)
minimal-disruption-icon
Minimal
Disruption
objectives-_quality workmanship
Quality
Workmanship
fast-response-times-icon
Fast Response
Deadlines

SCOPE OF WORKS

  • Audit-based identification of eligible RCDs and circuit breakers for upgrade.
  • Safe isolation and shutdown of distribution boards (DBs) in accordance with University procedures.
  • Replacement of recalled or outdated RCDs with new, compliant models.
  • Detailed testing, including insulation resistance, polarity, RCD trip times, fault loop, and earth continuity checks.
  • Reinstatement and testing of all power and services post-installation.
  • Updated DB schedules and comprehensive as-built documentation, including before-and-after photos and asset register updates.

CHALLENGES

Delivering this project across regional campuses presented several logistical and technical challenges:

  • Works needed to be conducted outside standard hours to avoid disruption to faculty operations.
  • A wide variety of RCD brands and board configurations required careful onsite assessment and stock matching.
  • Critical circuits had to be identified and managed to avoid unintended shutdowns or nuisance tripping.
  • Ensuring compliance with strict University of Sydney Electrical Services Standards and documentation procedures.
University of Sydnet Image_3

OUR SOLUTION

Platinum Electricians adopted a structured, safety-first approach to meet the University’s operational and compliance goals. All technicians carried valid Contractor Cards and followed site-specific protocols. We conducted thorough risk assessments prior to each DB shutdown.

Where required, temporary power solutions were arranged to maintain continuity of essential services. Our team utilised University-held stock of RCDs and load centres efficiently, ensuring fast turnaround and cost-effective delivery. Weekly progress meetings with COS ensured transparency and alignment throughout the program.

THE RESULTS

Platinum Electricians successfully completed the program within the required timeframe.

Project outcomes:

  • Multiple distribution boards across both campuses upgraded to meet current safety standards.
  • Verified compliance with University and national electrical standards.
  • Detailed completion documentation submitted, including updated schedules and asset registers.
  • Zero safety incidents and minimal operational disruption.
  • Great Stakeholder satisfaction feedback.
20240904_095619

Let's chat about your next electrical project or ongoing maintenance requirements

1800 752 846